James Webb Telescope Prime Laser crews assisted ATK with the precision assembly for James Webb

ATK clean room total backplane

Prime Machine weld fabricated and machined the test stand for the James Webb Space Telescope a LARGE BRIDGE SIZED STRUCTURE BUILT TO WATCHMAKER TOLERANCES.  Additionally we assembled the actual structure of the space telescope for Orbital ATK, Inc. with our trained craftsmen using three dimension laser measuring instrumentation holding extremely tight tolerances required for holding the optics of the mirror.  The James Webb telescope will be the improved system replacing the Hubble Space providing us a clearer and deeper look into space.  NASA’s James Webb Space Telescope team fully deployed its 21 foot gold-coated primary mirror, successfully completing the final stage of all major spacecraft deployments to prepare for science operations.  We are extremely proud to have been part of this project to have been trusted with critical parts the project.